Site manager with building plans in front of a house under conversion
Smart contact form for construction companies

Assess building project inquiries better from the start

A building inquiry without details on the type of project, the property and the planning stage often leads to follow-up questions. MeinLeadFlow asks prospects on your website for the relevant key facts and shows them in a clear inquiry that helps you assess the job better from the outset.

For construction companies & building work

The problem

“We want to convert” – and what planning already exists?

Type of project unclear

“We’d like to convert” leaves open which work is due, how far planning has got and when it should start.

Planning stage missing

Whether plans, sketches or a permit already exist often remains open. A general message field does not ask about this specifically.

Timeframe and location missing

Where the building work is and when it should start is often missing from the first message.

The solution

Classify building projects by type, planning status and timeframe

MeinLeadFlow can map conversion, extension, shell construction and renovation as separate services. For an extension, the widget asks about the planning stage, the permit and the preferred start of construction, for example; for a renovation, about the property and the scope of work. You then see the answers and an AI summary in the dashboard – as a basis for the first meeting.

Conversion, extension, shell

Each project type gets its own required questions, for example on plans or permits.

Site in your area?

If the site is outside your service area, the inquiry is flagged.

A first meeting with a plan

Answers and the AI assessment show which documents are still missing.

A conversion is often followed by painting work: Contact form for painting businesses.

New windows and doors in an extension: Contact form for window fitters.

How it works

Clients describe their building project in four steps

Which kind of build

Conversion, extension, shell construction or renovation.

Property and scope

Building type and what is to be built or changed.

Planning status and timeframe

Are there plans, sketches or a permit, when should work start? Plus location and contact details.

Request documents

In the dashboard you see the details and the AI summary and know which documents to ask for.

Example

Example extension: first sketches available, planning permission not yet clarified

Fictional example

Extension to an existing building

Automatically deleted after 6 monthsService area: Core area
Name
Monika Musterfrau
Phone
0123 4567901
Email
monika.musterfrau@example.com

AI assessment (internal)

Inquiry for an extension to a detached house. First sketches and a rough timeframe are available; permit status and scope still need clarifying. Next step: request planning documents and arrange an initial meeting.

Address
Musterweg 10, 12345 Beispielort
Town / postcode
12345 Beispielort
What type of property is it?
Detached house
How far along is your planning?
First sketches available
Is planning permission already in place?
Not yet clarified
When should construction start?
In 6 to 9 months
What is the scope of the project?
Additional living space
Available before the first call:
property, planning status with sketches, open permit status, start of construction and scope.
Still to be assessed by the professional:
permit, structural engineering, technical feasibility and costs.

All details, including the AI assessment, are fictional. Actual questions and results depend on the configuration and on the answers prospects give.

Checklist

Key facts for the first meeting: the building project checklist

You decide which questions your form asks when you set it up.

Available with the inquiry

  • Project type: conversion, extension, shell or renovation
  • Property type
  • Scope of the project
  • Planning status: sketches, plans, architect
  • Building permit status, if known
  • Preferred start of construction and location

Still assessed by your business

  • Structural engineering and technical feasibility
  • Permit eligibility and planning application
  • Cost estimate and construction schedule
Benefits

Planning status, project type, start date: benefits for builders

Plans, sketch, architect?

Whether there are sketches, plans or already an architect is stated in the inquiry.

Project type clear

Conversion, extension and renovation get different questions.

Preferred start date

The preferred start date helps you fit the job into your workload.

Sites outside your area flagged

Inquiries for sites outside your service area are flagged.

Summary

The AI summarises the details and names missing documents.

Embedded in your company site

The widget is embedded in your existing website.

How much time follow-up questions on building inquiries cost is estimated by the time savings calculator with your figures.

Why a form with required questions does more for building inquiries than a chatbot: AI contact form vs. chatbot.

FAQ

Website inquiries for construction companies: questions and answers

Which information helps with a building project inquiry?
Type of project, type of property, location, planning stage, timeframe and existing documents form a sound basis.
Can the widget tell new builds, conversions and renovations apart?
Yes. The services can be configured and given different follow-up questions.
Does MeinLeadFlow create construction quotes automatically?
No. MeinLeadFlow structures inquiries and supports the first assessment, but it does not create binding quotes.
Does the AI check permits or structural engineering?
No. Permits, structural engineering and technical feasibility have to be checked by professionals.
Can I take my service area into account?
Yes. A configured service area can be used to flag inquiries.
Is the widget also suitable for smaller construction companies?
Yes, if the website receives inquiries regularly and you want to collect the key project details early.
What does MeinLeadFlow cost?
The pilot phase is currently running: as a pilot customer you use MeinLeadFlow free of charge for 6 months – with no automatic paid renewal. After that, the regular price is expected to be €30–40 per month; pilot customers receive preferential terms.

Receive structured building inquiries – as a pilot company

Try it as a pilot business and see which key facts your construction company can get before the first meeting.

6 months free – no automatic renewal